Colonnina Enel Energia 22kW charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Nessun problema su presa tipo 2, sia con card che con app JuicePass. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post152546.html#p152546
https://www.forumelettrico.it/forum/post152546.html#p152546 Comment by ForumElettrico.it 11/15/2020 09:29:28
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-energia-22kw-reggio-emilia-re-via-john-fitzgerald-kennedy-17-t2820.html Comment by ForumElettrico.it 09/01/2018 07:17:58
Other Charging Locations
There are 9 matching results
IPlanet IP
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ceire
1
2
Private - For Staff, Visitors or Customers
Operational
IrenGo Il Volo Carrozzone
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva McDonald’s
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Il Volo Carrozzone
2
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Tondo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Viale Trento Trieste
4
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Viale Regina Elena
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Jaguar Schiatti Class
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-11-15
Uploaded by ForumElettrico.it on 2020-11-15
Uploaded by ForumElettrico.it on 2020-11-15
Uploaded by ForumElettrico.it on 2018-09-01
Uploaded by ForumElettrico.it on 2018-09-01
Uploaded by ForumElettrico.it on 2018-09-01
Uploaded by ForumElettrico.it on 2018-09-01