EnelX Alberto Sordicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
SCAME Type 3A (Low Power)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Mi sono accorto uscendo che c'è una sbarra, ma era aperta e non presenta alcun orario visibile: forse non la chiuderanno mai? Ho provato anche a chiedere ma nessuna sapeva nulla. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/post192454.html#p192454
https://www.forumelettrico.it/forum/post192454.html#p192454 Comment by ForumElettrico.it 04/09/2021 15:56:36
[ General Comment , Charged Successfully ] https://www.forumelettrico.it/forum/colonnina-enel-x-22-kw-stadio-il-noce-noceto-pr-via-alberto-sordi-t3519.html Comment by ForumElettrico.it 08/31/2018 18:05:51
Other Charging Locations
There are 9 matching results
EnelX Piazzale dello Sport
3
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnelX Boni e Gavazzi
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conad Noceto
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Ponte Taro
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel San Marco & Formula Club
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Powy Parma Ovest Ponte Taro
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E.ON Albergo Trattoria Emiliana Ponte Taro
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ponte Taro Madre Teresa di Calcutta | EnelX
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Casa della Salute
1
4
Public
Operational
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-04-09
Uploaded by ForumElettrico.it on 2021-04-09
Uploaded by ForumElettrico.it on 2018-08-31
Uploaded by ForumElettrico.it on 2018-08-31
Uploaded by ForumElettrico.it on 2018-08-31
Uploaded by ForumElettrico.it on 2018-08-31