Ekomobil - 22 kWcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ekomobil https://www.ekomobil.it
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Ricarica gratuita per tutti i clienti del Ristorante del Golf. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-ekomobil-22-kw-golf-club-il-torrazzo-cremona-cr-via-castelleone-101-t6246.html
https://www.forumelettrico.it/forum/colonnina-ekomobil-22-kw-golf-club-il-torrazzo-cremona-cr-via-castelleone-101-t6246.html Comment by ForumElettrico.it 03/27/2020 17:31:15
Other Charging Locations
There are 9 matching results
Crema Diesel S.p.A. | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bossoni Audi
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX cc Cremona Po
3
10
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Electra Cremona Po
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro Commerciale Cremona Po
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
CEE 3 Pin
Cremona Shopping Village | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carrozzeria Fratelli Sala | EnelX
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commerciale CremonaPo
1
2
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Via Milano
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)