Cervia Via Levico | EnelXcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Una delle colonnine di Cervia più lontane dal mare, quindi fra le più facilmente libere: leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-cervia-ra-via-levico-30-t19055.html
https://www.forumelettrico.it/forum/colonnina-enel-x-20-kw-cervia-ra-via-levico-30-t19055.html Comment by ForumElettrico.it 07/11/2021 13:33:18
Other Charging Locations
There are 9 matching results
Cervia Centro Sportivo Liberazione | EnelX
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive XXV Aprile
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cervia Deledda | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cervia Lungomare Gabriele D'Annunzio | EnelX
2
7
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cervia Montale | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Conad
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Hotel Aurelia
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Hotel Mare Pineta
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Palace Hotel
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-07-11
Uploaded by ForumElettrico.it on 2021-07-11
Uploaded by ForumElettrico.it on 2021-07-11
Uploaded by ForumElettrico.it on 2021-07-11
Uploaded by ForumElettrico.it on 2021-07-11