Bank of America - Villa Parkcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Business hours
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
123521
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Walmart 2295 - Richmond, VA
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
DASH IN DASH IN-1
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
DEV PUBLIC LGBG LOT A #2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Verizon - Richmond
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Wawa #655
1
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Wawa #655
Public
Temporarily Unavailable
Level 3: High (Over 40kW)
CHAdeMO
NED STAPLES MILL 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Glen Allen, VA
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Creeks at Virginia Center - Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Upload your own photos for this location: Sign In