Commission Scolaire Sir-Wilfrid-Laurier - Ecole Arundelcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
For employee use only
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
84678
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Golf Arundel
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Municipalité d'Huberdeau
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
10, rue de l'Hôtel-de-Ville, Montcalm
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Halte routière - 30 route du Lac-Rond Nord
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Chemin de Saint-Viateur
Privately Owned - Notice Required
Operational
Level 2 : Medium (Over 2kW)
NEMA 14-50
Amherst - 124 rue St-Louis
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Amherst - 124 rue St-Louis
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Hydro-Quebec
Private - Restricted Access
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
BRCC - Harrington - Centre communautaire
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In