CONCESSIONARIO Nissan AutoVarcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
PlugSurfing https://www.plugsurfing.com/ +49 30 9599814 10
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
CCS (Type 2)
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Utilizzabile solo durante l'apertura dell'esercizio. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-nissan-autovar-caresanablot-vc-via-vercelli-t16142.html
https://www.forumelettrico.it/forum/colonnina-nissan-autovar-caresanablot-vc-via-vercelli-t16142.html Comment by ForumElettrico.it 03/03/2021 17:11:52
Rating: 1 out of 5 [ Important Notice (For Other Users) , Charging Spot Not Accessible (Access locked or site closed) ]colonnina situata all'interno del concessionario.
Comment by eberna 02/28/2021 12:43:21
Other Charging Locations
There are 9 matching results
Carrozzeria Del Borgo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AutoVar Caresanablot | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Carrozzeria Motteran | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Sede Enel Vercelli | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LIDL Vercelli
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ALDI Vercelli
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Vercelli Stazione | IrenGO – atena
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Euronics Vercelli
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Giovanni Cavanna
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-03-03
Uploaded by eberna on 2021-02-28