Nissan Auto & Auto 2charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Failed to Charge (Required Other Access Card/Fob etc.) ]Accessibile h24 ma la ricarica può essere avviata solo dagli addetti della concessionaria. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-7-4-kw-nissan-auto-auto-2-reggio-emilia-re-via-beniamino-disraeli-2-t14107.html
https://www.forumelettrico.it/forum/colonnina-7-4-kw-nissan-auto-auto-2-reggio-emilia-re-via-beniamino-disraeli-2-t14107.html Comment by ForumElettrico.it 11/22/2020 09:38:20
Other Charging Locations
There are 9 matching results
Enel X Unieuro
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Edison Plug&Go Toyota Zatti Top Class
1
5
Private - Restricted Access
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BMW Reggio Motori
2
6
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Peugeot Campani Group
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Mercedes-Benz Autotorino
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro privato medico spallanzani
1
6
Private - For Staff, Visitors or Customers
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repower Jaguar Schiatti Class
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Il Volo Carrozzone
2
6
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
IrenGo Il Volo Carrozzone
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2020-11-22
Uploaded by ForumElettrico.it on 2020-11-22
Uploaded by ForumElettrico.it on 2020-11-22
Uploaded by ForumElettrico.it on 2020-11-22