Be Charge Porretta Termecharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]In pochi minuti a piedi arriviamo a Silla, frazione del comune di Gaggio Montano, dove troviamo diversi bar ed esercizi commerciali. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-alto-reno-terme-bo-via-john-fitzgerald-kennedy-173-t25500.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-alto-reno-terme-bo-via-john-fitzgerald-kennedy-173-t25500.html Comment by ForumElettrico.it 06/05/2022 17:06:09
Other Charging Locations
There are 9 matching results
Plenitude Berzantina
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Porretta Terme
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Stazione di Riola
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge La Cà
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Castel D'aiano
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plenitude Villa d'Aiano
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05
Uploaded by ForumElettrico.it on 2022-06-05