Enel X Way San Marzano sul Sarnocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Dista 6 chilometri dallo svincolo Angri sud della suddetta A3, utilizzabile 24 ore al giorno. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-way-fast-san-marzano-sul-sarno-sa-via-termine-bianco-14-t27205.html
https://www.forumelettrico.it/forum/colonnina-enel-x-way-fast-san-marzano-sul-sarno-sa-via-termine-bianco-14-t27205.html Comment by ForumElettrico.it 06/14/2023 05:46:45
Other Charging Locations
There are 9 matching results
LIDL Sarno
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Piazza Santissimo Rosario
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tramonti Campinola | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Tramonti | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Piazza del Gualdo | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parking Zeus Pompei
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Conad Superstore Cava de' Tirreni | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cava de' Tirreni Marconi | EnelX
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Mercato San Severino Priscoli | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-06-14
Uploaded by ForumElettrico.it on 2023-06-14
Uploaded by ForumElettrico.it on 2023-06-14
Uploaded by ForumElettrico.it on 2023-06-14