Be Charge charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Be Charge (Italy) https://www.bec.energy/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]A due passi dal centro storico e appena fuori dalla zona ZTL. Leggi la recensione completa qui > https://www.forumelettrico.it/forum/colonnina-fast-be-charge-viale-risorgimento-piacenza-t17912.html
https://www.forumelettrico.it/forum/colonnina-fast-be-charge-viale-risorgimento-piacenza-t17912.html Comment by ForumElettrico.it 07/17/2021 10:03:54
Other Charging Locations
There are 9 matching results
Eneldrive Cavour 60
1
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Grande Albergo Roma
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Eneldrive Cavour 7
3
4
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
LEAP Piacenza
1
3
Private - Restricted Access
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Scuola Pietro Giordani
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Eneldrive Punto Enel
2
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conciliazione
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl Piacenza Emilia
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Piacenza Cerati
4
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2021-07-17
Uploaded by ForumElettrico.it on 2021-07-17
Uploaded by ForumElettrico.it on 2021-07-17
Uploaded by ForumElettrico.it on 2021-07-17
Uploaded by ForumElettrico.it on 2021-07-17