Tesla Le Valli Di Carnia Aperto a veicoli NON TESLAcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Tesla (including non-tesla) https://www.tesla.com/en_AU/support/non-tesla-supercharging
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]8 connettori CCS Combo 2 da 250 kW già attivi su 16 predisposti. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-piscina-di-formigine-mo-via-delle-olimpiadi-9-t29969.html
https://www.forumelettrico.it/forum/colonnina-be-charge-22-kw-piscina-di-formigine-mo-via-delle-olimpiadi-9-t29969.html Comment by ForumElettrico.it 02/08/2023 06:41:02
Other Charging Locations
There are 9 matching results
ELECTRIP ULTRA FAST Viale Valli di Carnia
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVAD Ristorante La Tavola di Carnia
5
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Via Venzone
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ON MOBILITY Via Torre Picotta
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Gruppo Bravi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Ewiva Gemona del Friuli
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EVAD Market Verde
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Hotel Gortani
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Funghi in Piazza Villa Santina
1
3
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2023-02-08