Camilletti Impianti charging location

This charging location has not been recently verified and you should not rely solely on this information for journeys.

If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.

If the details are inaccurate please edit them.

Number Of Stations/Bays: 2
Operational Status: Operational
Latitude: 43.437853
Longitude: 13.625394
OCM Ref: OCM-190390
Network/Operator

(Unknown Operator)

Data Provider:

Open Charge Map Contributors http://openchargemap.org

Data License:

Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)

Data Quality Report


Data Quality Score: 80 out of 100
  •   User Feedback - No recent user verification.
  •   User Feedback - Has comments or check-ins
  •   User Feedback - Has photos
  •   Data Completeness - Unknown Usage Type
  •   Data Completeness - Operational Status Known
  •   Data Completeness - Equipment Details Present

CCS (Type 2)

Status Unknown
1 Present
OCM-CN-308641
50 kW DC

CHAdeMO

Status Unknown
1 Present
OCM-CN-308642
50 kW DC

Add your own comment/check-in for this location:

Sign In
[ General Comment , Equipment & Location Confirmed Correct ]

Vicino al Centro Commerciale Loreto Center, Spazio Conad ed al Centro Alimentazione e Movimento. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-fast-loreto-via-filello-zona-dietro-c-c-loretocenter-t20983.html

https://www.forumelettrico.it/forum/colonnina-fast-loreto-via-filello-zona-dietro-c-c-loretocenter-t20983.html Comment by ForumElettrico.it 12/03/2021 07:25:17

Other Charging Locations

There are 9 matching results

Loreto
  2

Via Sisto V
Loreto
AN
Italy
View
0.96 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
SCAME Type 3A (Low Power)

Enel X McDonald's
1   5

Via Paolo Borsellino, 2
Località Le Grotte
Loreto
AN
60025
Italy
View
1.41 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Enel X Conad
2   6

Via Musone 3/B
Castelfidardo
AN
Italy
View
1.84 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Numana Marcelli | EnelX
1   1

Via Litoranea 223
Marcelli
Numana
AN
60026
Italy
View
3.06 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

La Cipolla D'Oro
 

Contrada San Girio, 33
Porto Potenza Picena
MC
62018
Italy
View
3.21 Miles
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Free to X AdS Conero Ovest
4   8

A14 km 239 (verso Taranto)
Numana
AN
Italy
View
3.36 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)

Castelfidardo Murri | EnelX
 

Via Romolo Murri
Castelfidardo
AN
60022
Italy
View
3.49 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Marcelli Parcheggio Via Venezia | EnelX
 

Via Venezia
Marcelli
Numana
AN
60026
Italy
View
3.66 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Be Charge - Marcelli Parcheggio Adriatico
  2

Parcheggio Adriatico
Loc. Marcelli
Numana
60026
Italy
View
4.1 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)

Upload your own photos for this location: Sign In

Uploaded by ForumElettrico.it on 2021-12-03