Free To X AdS Lario Ovestcharging location
in construction
Free To X https://www.freeto-x.it/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Sono state raddoppiate le colonnine HPC da 2 a 4 ed anche aggiunto il POS sulla colonnina 1, che può attivare la ricarica anche su tutte le altre. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/post523336.html#p523336
https://www.forumelettrico.it/forum/post523336.html#p523336 Comment by ForumElettrico.it 02/21/2026 07:18:14
[ General Comment , Equipment & Location Confirmed Correct ]Quattro connettori CCS Combo 2 da 300 kW più una colonnina tristandard, situati nell'area di servizio lungo la Milano-Como in direzione Milano. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-freetox-ads-lario-ovest-autostrada-a9-milano-como-t24226.html
https://www.forumelettrico.it/forum/colonnine-freetox-ads-lario-ovest-autostrada-a9-milano-como-t24226.html Comment by ForumElettrico.it 12/22/2022 07:30:26
Other Charging Locations
There are 9 matching results
A9 AdS Lario Est
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Free To X AdS Lario Est
1
5
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Esselunga
1
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BENNET Cassina Rizzardi | BECHARGE
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Bulgarograsso | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bennet Centro Commerciale Monticello
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bulgarograsso Borsellino | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Appiano Gentile Vignetta | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Appiano Gentile Plinio | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2026-02-21
Uploaded by ForumElettrico.it on 2022-12-22