GreenFlux Volvo Pieralisicharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Greenflux http://www.greenflux.nl/ 088 60 50 700
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Due connettori CCS Combo 2 da 175 kW situate nel parcheggio adiacente alla concessionaria. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hpc-175-kw-volvo-recharge-highways-t24330.html
https://www.forumelettrico.it/forum/colonnina-hpc-175-kw-volvo-recharge-highways-t24330.html Comment by ForumElettrico.it 07/04/2022 14:21:32
Other Charging Locations
There are 9 matching results
Audi Zentrum Ancona
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sede Enel Ancona | EnelX
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BECHARGE Hotel Ristorante la Perla Camerano
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
McDonald's Ancona Baraccola
3
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X IKEA Aspio Terme
3
8
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X - Leroy Merlin
2
8
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
MD Ancona
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Loginet Nissan Conero Car Aspio Terme
1
1
Public - Membership Required
Planned For Future Date
Level 3: High (Over 40kW)
CHAdeMO
LIDL - Baraccola Ovest
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-07-04
Uploaded by ForumElettrico.it on 2022-07-04