Edison Plug&Go Toyota Autosalcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto abbiamo un comodo bar ed il centro dista solo pochi minuti a piedi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-edison-plug-go-22-kw-toyota-autosal-langhirano-pr-viale-martiri-della-liberta-2-t26692.html
https://www.forumelettrico.it/forum/colonnina-edison-plug-go-22-kw-toyota-autosal-langhirano-pr-viale-martiri-della-liberta-2-t26692.html Comment by ForumElettrico.it 08/11/2022 13:55:17
Other Charging Locations
There are 9 matching results
Enel X Val Parma
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enerhub Coop
2
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
CARBOGNANI OIL
1
3
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Joinon Trattoria Leoni Barbiano
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Manni Energy Eurospin Pilastro
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Campo Sportivo di San Michele Tiorre
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parco Bazzano Costa Pieve
1
1
(Unknown)
Operational
Be Charge Fanfulla
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Prese Comune 3,7kW
(Unknown)
Operational
Level 2 : Medium (Over 2kW)
Unknown
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-08-11
Uploaded by ForumElettrico.it on 2022-08-11
Uploaded by ForumElettrico.it on 2022-08-11
Uploaded by ForumElettrico.it on 2022-08-11
Uploaded by ForumElettrico.it on 2022-08-11