Ewiva Pomigliano d'Arcocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Due Hypercharger Alpitronic dotate di 4 CCS Combo 2 da 150 kW, accanto ad un parco ed un bar. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-high-power-enel-x-pomigliano-d-arco-na-t21391.html
https://www.forumelettrico.it/forum/colonnine-high-power-enel-x-pomigliano-d-arco-na-t21391.html Comment by ForumElettrico.it 11/02/2022 07:13:01
Rating: 5 out of 5 [ General Comment , Charged Successfully ]working ok inside the parking ...right side
Comment by Roberto 08/30/2022 14:01:04
Other Charging Locations
There are 9 matching results
Enel X Way McDonald's
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ionity Le Porte di Napoli
1
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Napoli Nord
1
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
CPM Carburanti
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Marigliano staZIONe UtOpiA | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marigliano Suor Felice Vincenza Mautone | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marigliano Isonzo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di Marigliano | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Cercola Serao | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-11-02
Uploaded by ForumElettrico.it on 2022-11-02
Uploaded by ForumElettrico.it on 2022-11-02
Uploaded by ForumElettrico.it on 2022-11-02
Uploaded by ForumElettrico.it on 2022-11-02