Free To X AdS Casilina Estcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Free To X https://www.freeto-x.it/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CCS (Type 2)
CHAdeMO
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]4 colonnine HPC da 300 kW con 8 connettori CCS2 sotto la tettoia, più una fast multistandard accanto ma all'addiaccio. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-free-to-x-high-power-ads-casilina-est-castrocielo-stro-fr-km-93-a1-verso-roma-t27959.html
https://www.forumelettrico.it/forum/colonnine-free-to-x-high-power-ads-casilina-est-castrocielo-stro-fr-km-93-a1-verso-roma-t27959.html Comment by ForumElettrico.it 01/07/2025 10:52:06
Other Charging Locations
There are 9 matching results
Free to X Casilina Ovest
1
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
BECHARGE Dea cafè Castrocielo
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
AdS EDO
1
3
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX EVA+ Cassino
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Best Western Hotel Rocca
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
EnelX EVA+ Conad CC Gli Archi Cassino
1
2
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Ceprano
4
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ceprano Supercharger
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Atina Lione | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-01-07
Uploaded by ForumElettrico.it on 2025-01-07
Uploaded by ForumElettrico.it on 2025-01-07
Uploaded by ForumElettrico.it on 2025-01-07
Uploaded by ForumElettrico.it on 2025-01-07