LeasePlan Le Palme blucharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Evway https://evway.net +39 02 35954219
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Equipment & Location Confirmed Correct ]Una HPC dotata di tutti i connettori, type2, CCS e Chademo, situata a 300 m circa dall'uscita autostradale di Calenzano. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-hpc-evway-t24219.html
https://www.forumelettrico.it/forum/colonnina-hpc-evway-t24219.html Comment by ForumElettrico.it 12/21/2022 17:17:38
Other Charging Locations
There are 9 matching results
Officina Bi Auto | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via Enzo Cherzani
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via di Pratignone
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Calenzano Cherzani | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Calenzano A.S.D. Settimello | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Via del Colle
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Free To X Casello di Firenze Nord
2
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X HPC Calenzano
2
2
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Tesla Supercharger Campi Bisenzio
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2022-12-21
Uploaded by ForumElettrico.it on 2022-12-21
Uploaded by ForumElettrico.it on 2022-12-21
Uploaded by ForumElettrico.it on 2022-12-21