To edit, add comments or upload photos: Sign In
Keuda Paroninkujacharging location
Nearest Address:
Puutarhantie 1
Saarentaus
Uusimaa
04920
Finland
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
2
Latitude:
60.73674
Longitude:
25.426468
OCM Ref: OCM-215836
Data Provider:
NOBIL https://nobil.no/
Data License:
NOBIL by Enova is licensed under a Creative Commons Attribution 4.0 International (CC BY 4.0) License.
Providers Ref:
12596
Data Quality Report
Data Quality Score: 50 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Unknown Usage Type
- Data Completeness - Unknown Operational Status
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Status Unknown
OCM-CN-363393
11 kW
AC (Three-Phase)
400 V
16 A
Mode 3
Type 2 (Socket Only)
Status Unknown
OCM-CN-363394
11 kW
AC (Three-Phase)
400 V
16 A
Mode 3
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Virta Keuda Saaren Kartano
0.09 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Plugit Saaren eläinklinikka
0.3 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Plugit Saaren koulu ja päiväkoti
0.49 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
4251, Henna Asemanrinne
4.92 Miles
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Level 3: High (Over 40kW)
Type 2 (Socket Only)
Recharge Juustoportti Mäntsälä
4.93 Miles
Level 3: High (Over 40kW)
CHAdeMO
Level 3: High (Over 40kW)
CHAdeMO
St1 St1 Mäntsälä P
4.99 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Neste Neste Orimattila Tuuliharja
7.06 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plugit Anttilan päiväkoti
7.1 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Plugit Sälinkään koulu ja päiväkoti
7.11 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In