Momentum Developments Inccharging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
250308
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Seaway Mall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Octate Mcleod Inc. 1 - A
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Mike Knapp Ford Sales
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Seaway Mall Cinema entrance
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WELLAND WELLANDG3EAST
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Green Economy
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FLI CHARGE 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FLI CHARGE 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Electrify Canada - Welland
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
Upload your own photos for this location: Sign In