E.S. BP Úbeda charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
TotalEnergies (ES) https://www.totalenergies.es/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
PowerElectronics NB240 charger (500A peak). Power is split between both outlets. The DC charger allows charging one vehicle at 100kW, or two simultaneous charges at 50kW.
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Supermercado AMA
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
BMW Motrimotor
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
E.S. Euroil Cuatro Caminos
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Fonsa Motor
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Burger King Úbeda
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Repsol ES, EL POLIGONO
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Aparcamientos Ubeda
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Carrefour Úbeda
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenoil Úbeda I
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)