Davis Amtrak Stationcharging location
1 SP Inductive
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
33556
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - Has recent user verification
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Type 1 (J1772)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Davis Amtrak Station
1
1
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
4th and G Plaza Public Parking Garage
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
4TH ST 1 4TH ST 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BOA CA3-147 (Davis, CA)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Davis Commons
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Holiday Inn Express
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
University of California - Davis Extension - Lot 80
Public
Operational
Level 1 : Low (Under 2kW)
NEMA 5-20R
City of Davis - City Hall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
UC DAVIS TAPS
Public
Level 1 : Low (Under 2kW)
NEMA 5-20R
Upload your own photos for this location: Sign In