To edit, add comments or upload photos: Sign In
Plug-In NCW: Pybus Public Marketcharging location
Nearest Address:
8 N Worthen Ave
Wenatchee
WA
98801
United States
509-888-3900
General Information:
240V 75A Level 2 CS-100, located on north side of parking lot, mounted on side of outbuilding. Map marker is precise.
This charging location has not been recently verified and you should not rely solely on this information for journeys.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Number Of Stations/Bays:
1
Usage:
Public
Usage Cost:
Free
Operational Status:
Operational
Latitude:
47.4249435
Longitude:
-120.3078886
OCM Ref: OCM-29384
Access Information:
24 hours daily
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
Operational
1 Present
OCM-CN-32314
19.2 kW
AC (Single-Phase)
240 V
80 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
CCSCW CHARGER 10
0.14 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CCSCW CHARGER 9
0.14 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Wenatchee Convention Center
0.28 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Chelan County Public Utility District
0.47 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
DOL WENATCHEE
0.54 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WADOC WVRC 2
0.6 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
WADOC WVRC
0.6 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
HQ FACILITY PUD PL 2
0.66 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Community Services (DCFC)
0.82 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In