Enel X Way New Carscharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Situata dentro il parcheggio della Autocarrozzeria New Cars Sas ed è soggetta agli orari di apertura dei cancelli. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-way-20-kw-new-cars-arezzo-ar-via-thomas-edison-42-t36328.html
https://www.forumelettrico.it/forum/colonnina-enel-x-way-20-kw-new-cars-arezzo-ar-via-thomas-edison-42-t36328.html Comment by ForumElettrico.it 03/02/2024 16:27:18
Other Charging Locations
There are 9 matching results
SUPER A&O AREZZO Pisacane | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
COOP CENTRO Arezzo Setteponti | EnelX fast
3
14
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Parchggio Multipiano Ospedale San Donato
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Distributore Eni / MCDonald
2
Public
Not Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Centro commerciale Al Magnifico
1
1
Public
Operational
Level 2 : Medium (Over 2kW)
Unknown
Enel X Conad Ponte A Chiani
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Powy Al Magnifico
1
7
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parcheggio del Rossellino
1
3
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Pittarosso Arezzo via Romana
1
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-03-02
Uploaded by ForumElettrico.it on 2024-03-02
Uploaded by ForumElettrico.it on 2024-03-02
Uploaded by ForumElettrico.it on 2024-03-02