Via Capone - Liceo E. Fermi - Molinarocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
ZapGrid https://www.zapgrid.net/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Montesarchio - Via G. Amendola
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Area Parcheggio - Montesarchio
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Molinaro srl - Cervinara
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Molinaro srl - Cervinara
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Arpaia - ZapGrid
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Comune Foglianise
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Centro Commerciale Vulcano Buono
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Sant'Agata de' Goti Pennino | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SANT'AGATA DE' GOTI Capellino | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In