To edit, add comments or upload photos: Sign In
EPEC Punto E - Edificio Centralcharging location
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
EV Jungle App
Operational Status:
Operational
Latitude:
-31.40739904616003
Longitude:
-64.18612905250757
OCM Ref: OCM-306740
Network/Operator
Chargebox (AR) https://chargeboxnet.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-585125
50 kW
DC
500 V
125 A
CHAdeMO
Operational
1 Present
OCM-CN-585126
50 kW
DC
500 V
125 A
Type 2 (Tethered Connector)
Operational
1 Present
OCM-CN-585127
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 2 matching results
Punto E - Paseo del Buen Pastor Córdoba
1
1.17 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Punto E - Parque del Chateau
4.71 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Upload your own photos for this location: Sign In