Sarni AdS Galdo Ovestcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Solo 2 su quattro sono accese, e si possono attivare solo con le card compatibili perché non c'è segnale telefonico. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-sarni-fast-ads-galdo-ovest-lauria-pz-a2-km-190-verso-reggio-calabria-t40501.html
https://www.forumelettrico.it/forum/colonnine-sarni-fast-ads-galdo-ovest-lauria-pz-a2-km-190-verso-reggio-calabria-t40501.html Comment by ForumElettrico.it 12/30/2024 07:52:57
Other Charging Locations
There are 9 matching results
Sarni AdS Galdo Est
1
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnelX EVA+ Galdo di Lauria
2
3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lauria Caduti VII Settembre 1943 | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lauria Contrada Cona | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lauria Plebiscito | EnelX
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Laino Castello Repubblica | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Laino Castello Vittorio Veneto | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Municipio di LAINO CASTELLO | ENELX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Latronico D'Acquisto | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2024-12-30
Uploaded by ForumElettrico.it on 2024-12-30
Uploaded by ForumElettrico.it on 2024-12-30
Uploaded by ForumElettrico.it on 2024-12-30
Uploaded by ForumElettrico.it on 2024-12-30