To edit, add comments or upload photos: Sign In
Trugo - O37 - İzmir Yönücharging location
Nearest Address:
Istanbul Izmir Otoyolu O37
Orhangazi
Bursa
Turkey
Number Of Stations/Bays:
8
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
40.525437451727385
Longitude:
29.34158976056048
OCM Ref: OCM-308474
Network/Operator
Trugo (TR) https://www.trugo.com.tr/ +908508087846
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-590558
180 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ASTORSARJ - O37 - İzmir Yönü
0.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
5 Şarj - O37 - İzmir Yönü
0.02 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ZES - Oksijen O37 İzmir Yönü
0.08 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eşarj - O37 - İzmir Yönü
0.1 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Otojet - O37 - İzmir Yönü - TotalEnergies
0.12 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
wat mobilite - O37 - İzmir Yönü
0.12 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ZES - O37 - İstanbul Yönü
0.13 Miles
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Otojet - O37 - İstanbul Yönü - TotalEnergies
0.15 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Eşarj - O37 - İstanbul Yönü
0.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In