Enel X Alberi di Vigattocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Due colonnine per 4 CCS Combo 2 da 60 kW, situate a pochi passi dal centro della frazione e separate dal confine della stessa. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-enel-x-fast-parma-pr-strada-chiaviche-99-t40929.html
https://www.forumelettrico.it/forum/colonnine-enel-x-fast-parma-pr-strada-chiaviche-99-t40929.html Comment by ForumElettrico.it 02/01/2025 10:47:27
Other Charging Locations
There are 9 matching results
Powy Parma Golf Vigatto
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge The Space Cinema
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
EnerMia The Space Cinema
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Campus Parma | EnelX
1
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Università degli Studi di Parma
1
2
(Unknown)
Unknown
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EnerMia Corcagnano
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Parma Rotta
1
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eurosia
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Conad
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-02-01
Uploaded by ForumElettrico.it on 2025-02-01
Uploaded by ForumElettrico.it on 2025-02-01
Uploaded by ForumElettrico.it on 2025-02-01
Uploaded by ForumElettrico.it on 2025-02-01