Ewiva Parco Amicocharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Ewiva (IT) https://ewiva.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Sono situate nel parcheggio di un parco pubblico e poco lontano troviamo un supermercato, per cui sono strategiche anche per ricaricare mentre si fa la spesa. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-parco-amico-sassuolo-mo-via-caduti-senza-croce-t41309.html
https://www.forumelettrico.it/forum/colonnine-ewiva-high-power-parco-amico-sassuolo-mo-via-caduti-senza-croce-t41309.html Comment by ForumElettrico.it 03/01/2025 09:26:38
Other Charging Locations
There are 9 matching results
Be Charge Parco Amico
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Agorà Leonardo
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SASSUOLO PARCHEGGIO Gorizia | ENELX
1
5
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SASSUOLO Parcheggio piazza Risorgimento | ENELX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Stazione di Sassuolo Terminal | EnelX
3
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Cimitero di San Prospero
1
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Eni
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lidl Sassuolo
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-03-01
Uploaded by ForumElettrico.it on 2025-03-01
Uploaded by ForumElettrico.it on 2025-03-01
Uploaded by ForumElettrico.it on 2025-03-01
Uploaded by ForumElettrico.it on 2025-03-01