Enel X charging location
Inside the unpaved parking
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Accanto alla colonnina troviamo un bagno pubblico pulito ed accessibile liberamente, ma soprattutto a soli 50 metri si arriva alla splendida spiaggia dove troviamo lo stabilimento balneare con bar vista mare. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-x-fast-san-teodoro-ss-via-del-tirreno-24-t42213.html
https://www.forumelettrico.it/forum/colonnina-enel-x-fast-san-teodoro-ss-via-del-tirreno-24-t42213.html Comment by ForumElettrico.it 05/10/2025 17:22:19
Other Charging Locations
There are 9 matching results
Via Grazia Deledda
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hotel San Teodoro
7
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Residence Hotel Lu Nibareddu by Ecoesco
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
IEC 60309 5-pin
EnelX Budoni
1
2
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Murta Maria
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Via del rabarbaro
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Olbia Mare
2
5
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
ParkinGO OLBIA
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tesla Supercharger
2
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-05-10
Uploaded by ForumElettrico.it on 2025-05-10
Uploaded by ForumElettrico.it on 2025-05-10
Uploaded by ForumElettrico.it on 2025-05-10
Uploaded by ForumElettrico.it on 2025-05-10