Poste Italiane charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 2 (Socket Only)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Attenzione che se si parcheggia correttamente seguendo le strisce si blocca tutto il passaggio: in pratica sono due stalli riservati alle microcar :-). Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-poste-italiane-22-kw-domus-de-maria-ca-via-provinciale-37-t42303.html
https://www.forumelettrico.it/forum/colonnina-poste-italiane-22-kw-domus-de-maria-ca-via-provinciale-37-t42303.html Comment by ForumElettrico.it 05/18/2025 17:59:13
Other Charging Locations
There are 9 matching results
Forte Village Resort
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Enel X Santa Margherita
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
ElectriEase Marina di Teulada
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Conad
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way I Gabbiani
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Enel X Way Sarroch
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Azienda Agricola Villa d'Orri
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-05-18
Uploaded by ForumElettrico.it on 2025-05-18
Uploaded by ForumElettrico.it on 2025-05-18
Uploaded by ForumElettrico.it on 2025-05-18