Agrifer charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 51 kW e dietro la colonnina troviamo diversi centri direzionali con alcuni bar e ristoranti, tabacchino e negozi. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-agrifer-fast-modena-mo-strada-scaglia-est-146-t42377.html
https://www.forumelettrico.it/forum/colonnina-agrifer-fast-modena-mo-strada-scaglia-est-146-t42377.html Comment by ForumElettrico.it 05/24/2025 10:54:27
Other Charging Locations
There are 9 matching results
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Eni
2
6
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
LIDL Modena
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Modena Amendola | ENELX BY HERA
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera Parco Enzo Ferrari
2
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge Centro Polivalente Corassori
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Hera BPER Centro Servizi
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Modena da Vinci | EnelX by Hera
2
5
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-05-24
Uploaded by ForumElettrico.it on 2025-05-24
Uploaded by ForumElettrico.it on 2025-05-24
Uploaded by ForumElettrico.it on 2025-05-24
Uploaded by ForumElettrico.it on 2025-05-24