To edit, add comments or upload photos: Sign In
UTE Terminal del Cerro 2charging location
General Information:
24 hs
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
UTE App
Operational Status:
Operational
Latitude:
-34.87344236292693
Longitude:
-56.250029821934106
OCM Ref: OCM-312911
Network/Operator
UTE (Uruguay) https://movilidad.ute.com.uy/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-602947
60 kW
DC
CCS (Type 2)
Operational
1 Present
OCM-CN-602948
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
UTE Terminal Del Cerro
0.06 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Plaza Samuel Lafone
0.84 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
EVE DISA Baltazar Brum
2
2.82 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
CCS (Type 2)
Plaza San Martín
2.84 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
eOne Axion Prado
3.21 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Palacio De La Luz
3.27 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Palacio De La Luz
3.29 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
Type 2 (Tethered Connector)
Plaza Pedro Poveda
3.55 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
NH Columbia
3.61 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In