Acea Sant'Antoninocharging location
Acea (IT) https://www.acea.it/e-mobility
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
CHAdeMO
Type 2 (Tethered Connector)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 52 kW ed il bar di fronte è aperto anche alla domenica (mattina perlomeno, poi non so). Leggi la https://www.forumelettrico.it/forum/post526357.html#p526357
https://www.forumelettrico.it/forum/post526357.html#p526357 Comment by ForumElettrico.it 03/29/2026 14:11:24
[ General Comment , Charged Successfully ]Tutto ok con Electroverse e dall'altro lato del parcheggio troviamo un comodo bar con tavoli anche all'aperto, accanto un ristorante pizzeria ed anche un altro dall'altro lato della strada. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-acea-fast-casalgrande-re-via-statale-142-b-sant-antonino-t42597.html
https://www.forumelettrico.it/forum/colonnina-acea-fast-casalgrande-re-via-statale-142-b-sant-antonino-t42597.html Comment by ForumElettrico.it 06/14/2025 09:45:43
Other Charging Locations
There are 9 matching results
Acea Veggia
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Emobitaly MD Casalgrande
3
6
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
SASSUOLO Parcheggio Legnago | ENELX
2
6
Public - Membership Required
Planned For Future Date
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
FastWay
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Castellarano Fontanina | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Way Palazzo Ducale
3
9
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
A2A Tigotà
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Lidl Sassuolo
1
4
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-03-29
Uploaded by ForumElettrico.it on 2026-03-29
Uploaded by ForumElettrico.it on 2025-06-14
Uploaded by ForumElettrico.it on 2025-06-14
Uploaded by ForumElettrico.it on 2025-06-14
Uploaded by ForumElettrico.it on 2025-06-14