VRG Components Inc.charging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Contact site for information
AmpUp https://ampup.io/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
335269
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Sweet Union Brewing
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Indian Trail Town Hall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Indian Trail Sheriff Office
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
The Kendall
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Exchange at Indian Trail
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Sterling Services
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Monroe Nissan
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Indian Trail Chrysler Dodge Jeep Ram
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Crossroads Ford of Indian Trail
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
Upload your own photos for this location: Sign In