METRO CAFE BWP DC CHARGERcharging location
24 hours daily
ChargePoint http://www.chargepoint.net/ 1-408-841-4500
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
171196
Data Quality Report
Data Quality Score: 80 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Other Charging Locations
There are 3 matching results
Auburn Nebraska Development Council
1
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 1)
METRO CAFE STATION 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
METRO CAFE BRNVILLE DEPOT
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In