To edit, add comments or upload photos: Sign In
Graff Chevrolet of Chestertoncharging location
Nearest Address:
239 Melton Road
Burns Harbor
IN
46304
United States
313-262-6722
Number Of Stations/Bays:
2
Usage:
Public
Operational Status:
Operational
Latitude:
41.605915182657
Longitude:
-87.11198907548
OCM Ref: OCM-357697
Network/Operator
Red E Charge https://www.redecharge.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 1)
Operational
2 Present
OCM-CN-654055
60 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Bob Rohrman Nissan
0.1 Miles
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Victory Nissan of Chesterton
0.12 Miles
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Graff Ford of Chesterton
0.16 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FRONIUS USA HQ PORTAGE
2.14 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
THOMAS PARK 2ND & BROADWAY
3.05 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
CLEAN AIR NIRPC
3.38 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
NIRPC
3.38 Miles
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
INDIANA DUNES V PARKING LOT
3.52 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Chesterton, IN
3.58 Miles
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Public
Operational
Level 3: High (Over 40kW)
NACS / Tesla Supercharger
Upload your own photos for this location: Sign In