The Lakeshore at LOSO Building 15charging location
Planned for future date. Not Operational.
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
ViaLynk - Lynkwell https://lynkwell.com/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
334418
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
Type 1 (J1772)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
SAFETY FUND CHARGER 2
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
American Homes Syracuse
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SAFETY FUND CHARGER 1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
RMI SPARKY
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Cicero Library
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
SIDNEYFCU CICERO 2
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
BURDICK BMW STATION 01
Public
Temporarily Unavailable
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
BURDICK BMW
Public
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Burdick Nissan
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In