Premium Outlets Montrealcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
24 hours daily
Electrify Canada https://www.electrify-canada.ca/
afdc.energy.gov http://www.afdc.energy.gov/
This data is provided by the National Renewable Energy Laboratory ("NREL"), which is operated by the Alliance for Sustainable Energy, LLC ("Alliance"), for the U.S. Department of Energy ("DOE"), and may be used for any purpose whatsoever.
189165
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CHAdeMO
kW power is an estimate based on the connection type
CCS (Type 1)
kW power is an estimate based on the connection type
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Electrify Canada - Premium Outlets Montreal
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CHAdeMO
Petro-Canada
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Azra - Halte de la Cité
1
3
Public
Operational
Level 3: High (Over 40kW)
CHAdeMO
Benny & Co. - Michèle-Bohec
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Energir Blainville
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Grand Times Hotel - Blainville
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FLO - CHSLD Blainville II
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
FLO - CHSLD Michèle-Bohec
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Mirabel - Centre culturel Domaine Vert-Nord
Public
Operational
Level 2 : Medium (Over 2kW)
Type 1 (J1772)
Upload your own photos for this location: Sign In