To edit, add comments or upload photos: Sign In
Dina Farms 🍽️🛍️charging location
Nearest Address:
Cairo-Alexandria RD
Sadat City
Egypt
Number Of Stations/Bays:
2
Usage:
Public
Operational Status:
Operational
Latitude:
30.28268925191543
Longitude:
30.60717810400388
OCM Ref: OCM-460476
Network/Operator
TAQA Volt (EG) https://taqavolt.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
2 Present
OCM-CN-774725
90 kW
DC
Type 2 (Socket Only)
Operational
2 Present
OCM-CN-804637
22 kW
AC (Three-Phase)
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 6 matching results
OLA: Sahrawy ⛽️
3.03 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
OLA: Sahrawy ⛽️
3.03 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
OLA: Sahrawy ⛽️
1
3.05 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
OLA: Sadat ⛽
8.16 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
7 Stars Mall 🛍️
1
8.88 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Watanya: Dabaa 2 ⛽
13.33 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In