Enel Conadcharging location
If you have visited this charging location recently please confirm that the information is accurate by adding a Comment or Check-In.
If the details are inaccurate please edit them.
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 90 out of 100
- User Feedback - No recent user verification.
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 88 kW ed è situata nel parcheggio del supermercato Conad in cui troviamo anche bagni accessibili liberamente. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-fast-conad-reggiolo-re-strada-malagoli-28-t44160.html
https://www.forumelettrico.it/forum/colonnina-enel-fast-conad-reggiolo-re-strada-malagoli-28-t44160.html Comment by ForumElettrico.it 11/01/2025 14:50:21
Other Charging Locations
There are 9 matching results
Enel X Way Scuola Carducci
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Plenitude Cimitero
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Be Charge
1
5
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Reggiolo Piazza Lidio Artioli | EnelX
2
6
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Ewiva Coop Reggiolo
1
4
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ristorante le Franchine
Private - For Staff, Visitors or Customers
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Ewiva Conad Gonzaga
3
7
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Be Charge Palazzetto dello Sport
3
9
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2025-11-01
Uploaded by ForumElettrico.it on 2025-11-01
Uploaded by ForumElettrico.it on 2025-11-01
Uploaded by ForumElettrico.it on 2025-11-01
Uploaded by ForumElettrico.it on 2025-11-01