To edit, add comments or upload photos: Sign In
The Banner Plazacharging location
Nearest Address:
Junction 12
M18
Ennis
Co. Clare
Ireland
Number Of Stations/Bays:
8
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
52.82851230040393
Longitude:
-8.935156727703315
OCM Ref: OCM-469820
Network/Operator
ePower https://www.epower.ie/ 1800 99 88 77
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
4 Present
OCM-CN-788682
125 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Vanderlust
0.85 Miles
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Kerry Agribusiness
1.74 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Circle K / Topaz Ennis
1
1.84 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CHAdeMO
TII Motorway Maintenance Depot
2.07 Miles
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Private - For Staff, Visitors or Customers
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Old Ground Hotel
2.2 Miles
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Notice Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Clare County Council
2.25 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Tom Smythe Park
2.3 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public Car Park, Off Abbey Street & Bank Place
1
2.3 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Éire Óg Inis GAA Club
2.38 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In