To edit, add comments or upload photos: Sign In
ایستگاه شارژ پلیس راه قزوینcharging location
Nearest Address:
Rajaee BLVD
Qazvin
استان قزوین
Iran, Islamic Republic Of
Number Of Stations/Bays:
4
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
36.25321593608882
Longitude:
50.11430783125286
OCM Ref: OCM-471010
Network/Operator
مپنا - empana (IR) https://www.emapna.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-791096
120 kW
DC
Unknown
Operational
1 Present
OCM-CN-791097
120 kW
DC
Unknown
Operational
1 Present
OCM-CN-791098
120 kW
DC
Unknown
Operational
1 Present
OCM-CN-791099
120 kW
DC
Unknown
Operational
1 Present
OCM-CN-791100
120 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 4 matching results
ایستگاه شارژ عاملیت بهمن موتور آوین تابش آوا - کد 1334
بلوار ابوترابی، نبش ورودی شهرک صنعتی البرز،
نمایندگی بهمن موتور (شرکت آوین تابش آوا)
استان قزوین
Iran, Islamic Republic Of
View
1.94 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ نمایندگی ایرانخودرو علیمحمدی
1
کنارگذر بلوار آیت الله خامنه ای
شهرک نفت
قزوین
استان قزوین
43156-11981
Iran, Islamic Republic Of
View
4.46 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ مرکز خرید نارون
6.19 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ مجتمع پرستو
6.8 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Upload your own photos for this location: Sign In