Enel charging location
Enel X https://eneldrive.enelx.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Questa risulta essere la colonnina pubblica in roaming più a sud di tutta Italia. Solo sull’isola di Lampedusa se ne trovano altre più a sud, che però attualmente non sembrano essere in roaming. In ogni caso, questa rimane la colonnina fast più a sud del Paese. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnina-enel-fast-portopalo-di-capo-passero-sr-via-carlo-goldoni-9-t44856.html
https://www.forumelettrico.it/forum/colonnina-enel-fast-portopalo-di-capo-passero-sr-via-carlo-goldoni-9-t44856.html Comment by ForumElettrico.it 01/04/2026 18:00:10
Other Charging Locations
There are 8 matching results
Pachino Via Taranto | EnelX
1
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel Q8
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Marzamemi Fortuna | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Lido di Noto Sabbia D'oro | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel Borgo Rio Favara
1
5
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Calabernardo Stella Maris | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Bluoil - Strada statale Sud Occidentale Sicula
1
Public - Pay At Location
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Centro Sportivo
2
9
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-01-04
Uploaded by ForumElettrico.it on 2026-01-04
Uploaded by ForumElettrico.it on 2026-01-04
Uploaded by ForumElettrico.it on 2026-01-04
Uploaded by ForumElettrico.it on 2026-01-04