Dia Torrentcharging location
REMO Mobility (ES) https://www.remo-mobility.com/
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Power electronics NB120 Charger. The DC charger allows charging one vehicle at 100kW, or two simultaneous charges at 50kW
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Ayunt. Torrent
1
Public
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Mercadona Torrent Iturbi
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Burger King Torrent
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ballenoil Torrent
1
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Repsol Torrent Camino Picaña
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
McDonald's Torrent
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
E.S. Benzina - Carrer dels Mauros
1
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ayunt. Torrent. Parking Plaza Colón
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Interparking Torrent
Public - Pay At Location
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Upload your own photos for this location: Sign In