To edit, add comments or upload photos: Sign In
Badamdar Hotelcharging location
General Information:
Badamdar Hotel
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Usage Cost:
0.26 AZN/kWt
Operational Status:
Operational
Latitude:
40.35440902103929
Longitude:
49.80444797344194
OCM Ref: OCM-472660
Access Information:
Badamdar Hotel
Network/Operator
Charge (AZ) https://charge.az/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Operational
1 Present
OCM-CN-793740
90 kW
DC
GB-T DC - GB/T 20234.3
Operational
1 Present
OCM-CN-793741
90 kW
DC
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
Avropa Azərbaycan Məktəbi (Badamdar)
2
0.53 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
SOCAR EDM
0.71 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Altes Plaza
1.29 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Sabah Residence
1.5 Miles
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Tethered Connector)
Intourist Hotel
1.56 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zefir Mall (MIDA Yasamal)
1
1.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Zefir Mall (MIDA Yasamal)
1
1.6 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Dalğa Plaza
1
1.61 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Dalğa Plaza
1
1.61 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In