Electrip Vulcano Buonocharging location
Electrip https://electripglobal.com/ +31 20 795 6703
Open Charge Map Contributors http://openchargemap.org
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 100 out of 100
- User Feedback - Has recent user verification
- User Feedback - Has comments or check-ins
- User Feedback - Has photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
CCS (Type 2)
Add your own comment/check-in for this location:
Sign In[ General Comment , Charged Successfully ]Tutto ok fino a 181,1 kW (maggiore del dichiarato) ma non è chiara la numerazione delle colonnine: la 1 sta a sinistra e la 10 a destra. Leggi la recensione completa qui: https://www.forumelettrico.it/forum/colonnine-electrip-hpc-centro-commerciale-vulcano-buono-via-boscofangone-nola-na-t40049.html
https://www.forumelettrico.it/forum/colonnine-electrip-hpc-centro-commerciale-vulcano-buono-via-boscofangone-nola-na-t40049.html Comment by ForumElettrico.it 01/18/2026 10:25:05
Other Charging Locations
There are 9 matching results
Tesla Supercharger Vulcano Buono Nola
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Interporto DI Nola Lotto | EnelX Fast
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Ewiva Q8
2
8
Public - Membership Required
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Pasta Bar Leonessa
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Tesla (Model S/X)
Municipio di Marigliano | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marigliano Isonzo | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marigliano Suor Felice Vincenza Mautone | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Marigliano staZIONe UtOpiA | EnelX
Public - Membership Required
Operational
Level 2 : Medium (Over 2kW)
Type 2 (Socket Only)
Enel X Cancello Scalo
1
4
Public
Operational
Level 3: High (Over 40kW)
CCS (Type 2)
Upload your own photos for this location: Sign In
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18
Uploaded by ForumElettrico.it on 2026-01-18