To edit, add comments or upload photos: Sign In
ایستگاه شارژ میلاد نورcharging location
Nearest Address:
پل آفتاب
منطقه ۱۰
استان اصفهان
Iran, Islamic Republic Of
+982130600
Number Of Stations/Bays:
2
Usage:
Public - Membership Required
Operational Status:
Operational
Latitude:
32.71046929074862
Longitude:
51.764416934624705
OCM Ref: OCM-478208
Network/Operator
مپنا - empana (IR) https://www.emapna.com/
Data Provider:
Open Charge Map Contributors http://openchargemap.org
Data License:
Licensed under Creative Commons Attribution 4.0 International (CC BY 4.0)
Data Quality Report
Data Quality Score: 70 out of 100
- User Feedback - No recent user verification.
- User Feedback - No comments or check-ins
- User Feedback - No photos
- Data Completeness - Usage Type Known
- Data Completeness - Operational Status Known
- Data Completeness - Equipment Details Present
GB-T DC - GB/T 20234.3
Operational
2 Present
OCM-CN-803022
60 kW
DC
500 V
125 A
CCS (Type 2)
Operational
2 Present
OCM-CN-803023
60 kW
DC
500 V
125 A
Add your own comment/check-in for this location:
Sign InOther Charging Locations
There are 9 matching results
ایستگاه شارژ تاکسی رانی
1.95 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ فرهان (بوستان کوثر)
4.2 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ لاهور
4.67 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ باغ فدک
4.82 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
ایستگاه شارژ پارکینگ چمران
5.14 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ چمران
5.25 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ خواجه نظام الملک
5.28 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ پارکینگ هشت بهشت
5.63 Miles
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
Public
Operational
Level 2 : Medium (Over 2kW)
GB-T AC - GB/T 20234.2 (Socket)
ایستگاه شارژ فرهان (باغ غدیر)
5.67 Miles
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Public - Membership Required
Operational
Level 3: High (Over 40kW)
GB-T DC - GB/T 20234.3
Upload your own photos for this location: Sign In